Send Message
Shaoxing City Shangyu Safeway Fire Fighting Equipment Co.,Ltd
Mail: sales13@safewayfighting.com TEL: +86-18224526559
Home > PRODUCTS > Fire Suppression System >
5kw Double Side Edge Press Machine For Dry Powder Cylinder CC-GF-ZYJ
  • 5kw Double Side Edge Press Machine For Dry Powder Cylinder CC-GF-ZYJ
  • 5kw Double Side Edge Press Machine For Dry Powder Cylinder CC-GF-ZYJ

5kw Double Side Edge Press Machine For Dry Powder Cylinder CC-GF-ZYJ

Place of Origin China
Brand Name Safeway Fire
Certification Normal
Model Number CC-GF-ZYJ
Product Details
Pipe Material:
Iron
Voltage:
220V
OEM:
Accepted
Weight:
1500KG
Power:
5KW
Pipe Thickness:
0.7-4.5mm
Output:
About 3000/8h
Machine Size:
1300*1100*1100mm
Highlight: 

5kw Double Side Edge Press Machine

,

Fire Extinguisher Side Press Machine 220V

,

Dry Powder Extinguisher Cylinder Making Machine

Product Description

 

5kw Double Side Edge Press machine for Dry Powder Cylinder CC-GF-ZYJ

 

1. Machine description:

After cutting,the cylinder flows into the double side crimping machine.Automatic loading of the product, double-sided blade hydraulic propulsion, double-side contraction of the bottle mouth at the same time, the size and diameter of each cylinder are the same.

 

2. Details
Item Double Side Edge Press machine for Dry Powder Cylinder Production Capacity 400pcs/hour
Power 5kw Model Number CC-GF-ZYJ
Voltage 220V Place of Origin China
Warranty 1 year Pipe Thickness: 0.7-4.5mm
Dimensions 1300x1100x1100mm Weight 1500kgs
Raw material Low-carbon Steel Pipe Type Rolled Steel Pipe

 

3. Feature Advantage
1. Professional technical team with more than 14 years’ experience in fire extinguisher industry
2. Internationalized sales team with 100% working enthusiasm
3. Fast preparation and delivery of goods.
4. Easy to use.
5. Direct Manufacturer =High Quality +Competitive price + Good Service

5kw Double Side Edge Press Machine For Dry Powder Cylinder CC-GF-ZYJ 0

FAQ
Q: What is delivery time for these products?
A:If you do not customize product color and desigh. Our normal delivery time of machine has passed the inspection is 20-30 days based on MOQ and finishing payment..
Q: What is your quality control process?
A:We control product quality before bulk production,in assemble line,in packaging line. We do 100% QC for products of each order.
Q: Do you supply free sample?
A: No, Because we are mechanical equipment products, We will provide professional guidance and services.

 

Contact Us at Any Time

+86-18224526559
Send your inquiry directly to us